Poll Result:

  • opened on February 20, 2019
  • closed on February 27, 2019

What do you want to see happen to Diablo Canyon Power Plant and its surrounding lands after it shuts down?

Public access. Let's build a network of trails and other offerings on the 12,000 acres of beautiful coastline.

13 votes (27.66%)

Conservation. Leave the land alone and make sure it can't be developed.

5 votes (10.64%)

Repurpose the desalination plant for SLO County water needs.

23 votes (48.94%)

I don't know, but get me away from that radioactive spent fuel!

6 votes (12.77%)

Add a comment